So. I went to school today like any other monday really. I didn't get shot; though thanks to thoes that called an asked (not even my school :>).
I moved a shelf into the hall closet and moved my.. supplies.. onto it. It made a huge bunch of room in my workshop and I'm really digging it. I just need to sort the crap out further and then I will have a much more functionable shot. The space is cramped, but with careful design an consideration I can make it work out.
I'm about to finally type out my research paper, and then try an think of a topic for my last paper/presentation for english comp.
Right now I'm sitting in a bath on my laptop, and I must say.. computing while wet feels so very naughty :>
Tomorrow I have work, but I'm not closing. I'm going to finish my paper today an tomorrow. Maybe I will get more work on the futon done.
I have all the rails cut for it, and all of the slats for the back side. All total I have about 40 more parts to cut before I can begin shaping and doing the glueup.
Since we rearranged the living room there is now a ton more room and the layout is much more natural than the old way. I really like how it is setup now.
Aside from that I don't know too much. Beltane is exceddingly close, and while I'm looking foward to it I'm still up in the air sicne Orren never got back to me about staffing.
Either way, thats about it.
I moved a shelf into the hall closet and moved my.. supplies.. onto it. It made a huge bunch of room in my workshop and I'm really digging it. I just need to sort the crap out further and then I will have a much more functionable shot. The space is cramped, but with careful design an consideration I can make it work out.
I'm about to finally type out my research paper, and then try an think of a topic for my last paper/presentation for english comp.
Right now I'm sitting in a bath on my laptop, and I must say.. computing while wet feels so very naughty :>
Tomorrow I have work, but I'm not closing. I'm going to finish my paper today an tomorrow. Maybe I will get more work on the futon done.
I have all the rails cut for it, and all of the slats for the back side. All total I have about 40 more parts to cut before I can begin shaping and doing the glueup.
Since we rearranged the living room there is now a ton more room and the layout is much more natural than the old way. I really like how it is setup now.
Aside from that I don't know too much. Beltane is exceddingly close, and while I'm looking foward to it I'm still up in the air sicne Orren never got back to me about staffing.
Either way, thats about it.